Menu
18 July 2017
Enertime announces the ORC plant commissioning on the UVE site in Colombelles

One of France’s leading industrial thermodynamic machines manufacturer for energy transition, announces the ORC plant commissioning at the UVE site in Colombelles. This 2 MWe ORC module values the heat seasonal excess resulting from the household waste incineration from Caen conurbation.

The UVE is currently supplying a heating network and therefore has an energy excess in water form at 190° when the outside temperature is mild. This surplus is valued by this ORC plant which is also capable of providing heat consumers with hot water at 45°.

Find the full press release here.