Menu
21 Mai 2018

Our new high power centrifugal compressor (800kWe) fully designed and assembled by Enertime, has successfully passed its mechanical tests. This equipment will equip the large high-temperature heat pumps that the company has been marketing since 2017 in France and on the international market. The compressor that has been tested belongs to a heat pump unit sold by Enertime to Synerval (Veolia Group) and will be installed in a Urban Waste incinerator in the city of Le Mans.