Menu
10 November 2014

Enertime carries out a study on the waste heat recovery potential on the diesel power plant of Longoni in Mayotte. This study is ordered by « Energie de Mayotte » and ADEME. The study is aimed at assessing the potential of extra power production and the financial economies that could be achieved with the installation of ORC modules to recover waste heat on exhaust pipes. The study concerns five 8 MWe and three 12 MWe diesel generators. Enertime started the study in August and will give by the end of the year a full economic and technical report for a turnkey solution to optimize the power production of the plant.